I was working today at Granite Lake Pottery, installing some storm windows on the studio. It was raining off and on, more on than off truth to tell. But I managed to stay pretty dry because of the generous overhangs on the building. I am a big fan of overhangs and was extremely happy when "First Day" decided to offer them as an extra. They make sense in so many ways. If nothing else, they give a poor dubber like myself a little shelter from the storm.
The forms went up today—it looks striking, almost alien, or maybe mad maxian. What it really serves to do is to give one a sense of how the house will sit on the land. The grade is not as bad as I had once thought. Of course, it is not fully graded yet, we have a ways to go.
The pour happens tomorrow, weather permitting. In the meantime, if anyone needs a bit of mud, drop us a line.
richard
Comments